MVP Critical Roadmap
Track the remaining critical work to make the demo deterministic and production-oriented.
A. Contracts (Issue #11)
- Deploy
JACKPolicyHookto target testnet. - Record deployed hook address +
POOL_MANAGER_ADDRESS. - Capture allow/reject smoke evidence (tx hash + logs).
- Finalize
JACKSettlementAdapterscope:- integrate + test now, or
- mark explicit non-demo stub with rationale.
- Validate dashboard/API wiring against deployed hook assumptions.
- Publish concise operator runbook for policy tuning/failure handling.
B. Execution/API (Issue #2)
- Replace simulated route stage with real LI.FI operation path (or hard gate + explicit fallback mode).
- Add explicit Yellow Network solver operation integration points (quote + execution lifecycle events).
- Expose deterministic
/api/quoteoutput structure with provenance fields (provider, route id, timestamp). - Ensure execution status transitions reflect actual backend outcomes, not only timers/mocks.
C. Demo Reliability
- Freeze demo environment variables for recording day.
- Pin chain/network endpoints and fallback RPC.
- Prepare a failover script for policy-check reverts.
- Capture final run artifacts (addresses, tx hashes, screenshots/logs).
Exit Criteria (Critical Path)
- Contract deployment + smoke evidence is attached to the contracts critical issue.
- API execution flow includes LI.FI + Yellow integration path or documented fallback gate.
- Demo script reflects real live path vs any mock behavior with no ambiguity.